What to measure before a dumpster comes down your driveway
The empty rectangle beside the garage is only part of a dumpster delivery. A driver also needs to reach that rectangle and get the unit back out after loading. Start your measurements at the curb, even if you know exactly where the box should sit.
Walk the approach in order
Look at the turn from the street, then at the entrance and the narrowest point farther back. A gate latch, brick pier or projecting step can take up more of the opening than you remember. Write down clear measurements between the fixed obstacles and say which way the gate swings.
Look up from ground level
From a safe position on the ground, note visible overhead lines, low branches and eaves. Describe them to the delivery team, along with the driveway slope and surface. Leave clearance decisions to the people placing the unit. A photo from the street can help them understand the approach.
Keep a loading path open
Trace the route from the door to the proposed spot. Check where a person carrying an old cabinet would turn and where the rest of the household will park. If you need access to a garage or a shared drive while the container is there, mention that before the delivery is scheduled.
Repeat the walk for pickup
Picture the same driveway at the end of the project. Boxes of new tile or a contractor’s trailer might arrive after the dumpster does. Reserve the pickup approach when you make the delivery plan. Ask for the dimensions of the actual unit and compare both container styles if the fit looks close.
Ready to schedule delivery?
Have your ZIP code, project date and debris list handy. We’ll check the route and price your load.